GPEGeoPrime Energy · Deep Dive
Deep Dive · Pipeline & Traction

Project Pipeline Detail

A 600+ MW development pipeline of behind-the-meter power campuses for AI and critical industrial loads, anchored by strategic clusters in Michigan and North Carolina.

Pipeline Summary

600+ MW
Total development pipeline
4
Active development projects
4 States
Geographic footprint
Active
Offtake discussions underway

Development Portfolio

Project / LocationScaleStageStatus DetailNext Milestone
River Rouge, Michigan200+ MW Site Selection 218-acre industrial site identified; site screening and control process underway; EGLE air permitting initiated; FERC interconnection filing in progress; active PPA negotiations with a hyperscale AI compute tenant. Secure site control · advance offtake
North Carolina Corridor300+ MW Diligence Large-scale corridor opportunity in active diligence; parallel development track leveraging River Rouge engineering and EPC frameworks. Secure strategic site control
Ann Arbor Pilot, Michigan1-5 MW Engineering First-to-close proof-of-concept for the GPE execution model; LOI executed on site; PPA under negotiation with a local anchor tenant; targeted 12-18 months to COD. HG-250 prototype positioning
Industrial Cluster, Midwest100+ MW Early Stage Early-stage industrial cluster opportunity; near-term 40 MW and larger-scale phases under evaluation. Complete feasibility study

Development Methodology

01

Planning & Feasibility

Comprehensive planning and feasibility studies, energy audits, compliance, EPC, safety, and design, to determine the optimal technical, financial, and environmental configuration per site.

02

Engineering & Permitting

Pre-NTP detailed engineering design, environmental assessments, and securing of all necessary permits and approvals.

03

Procurement & Construction

Equipment supplier selection, construction contract awards, and construction oversight with Tier-1 EPC partners.

04

Hybrid & Smart Controls

All systems integrated with intelligent, AI-driven plant controls and advanced SCADA, managing generation, storage, and loads in real time to optimize uptime, cost, and carbon impact.

05

Commissioning

System testing, commissioning, and commencement of commercial operations under long-term offtake structures.

Speed advantage

By avoiding the utility interconnection queue, GPE targets campus delivery in 18-24 months, versus 5-7 years for comparable grid-scale projects.

Offtake & Commercial Status

Note: Pipeline figures represent projects under development, not contracted or operating capacity. Project construction is financed at the project level and is not funded by the $8M seed round.