Generation 1 Design Targets

Generation 1 priority: a credible, deployable, stack-qualified SOFC system architecture, field-validatable engineering and commercial discipline over excessive technical novelty.

Headline Targets

250 kW
Net AC continuous output
55-60%
Net electrical efficiency (LHV)
80-90%
Total CHP efficiency
600-700°C
Stack operating temperature

Full Parameter Table

ParameterHG-250 Generation 1 Target
Net continuous output250 kW AC
Primary fuelPipeline natural gas
Secondary fuelsHydrogen blends and conditioned biogas
Net electrical efficiency55-60% LHV
CHP efficiency80-90%
Stack operating temperature≈ 600-700°C
ConfigurationAtmospheric, planar, modular multi-stack
Grid capabilityGrid-connected, islanding & black-start operation
Initial demonstrated runtime5,000 hours
Commercial durability objective40,000 hours
Initial degradation objective< 0.5% per 1,000 hours
Mature degradation target< 0.2% per 1,000 hours
Product scalabilityParallel 250 kW modules
SOEC (electrolysis) capabilityFuture generation, not Generation 1

Validation Strategy

Field-validatable baseline

Generation 1 targets are set to ensure technical credibility and rapid deployment. The program prioritizes stack-qualified system architecture over unproven performance claims, every target is designed to be demonstrated in the field.

Staged durability proof

An initial 5,000-hour field validation establishes the operating baseline; the long-term program targets 40,000-hour commercial durability with degradation maturing from below 0.5% toward below 0.2% per 1,000 hours.

Strategic Priority

“Generation 1 priority: credible, deployable, stack-qualified SOFC system architecture.” Designed for critical-load environments, with reliability and commercial discipline as first-order requirements.

Important: All figures on this page are Generation 1 design targets for a development-stage platform, subject to engineering validation and field demonstration. The HG-250 is not commercially deployed.